[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Highfield station

Future light rail station in Calgary, Alberta From Wikipedia, the free encyclopedia

Highfield station is a planned and approved CTrain light rail station in Calgary, Alberta, part of the Green Line. Construction will begin in 2022 and complete in 2027 as part of construction stage one, segment one.[1] The station is located in Calgary's oldest industrial area.

Quick Facts General information, Coordinates ...
Highfield
CTrain station
General information
Coordinates51.019890°N 114.032604°W / 51.019890; -114.032604 (Highfield station) / 51.019890; -114.032604 (Highfield station)][[Category:Pages using gadget WikiMiniAtlas]]"},"html":"Coordinates: </templatestyles>\"}' data-mw='{\"name\":\"templatestyles\",\"attrs\":{\"src\":\"Module:Coordinates/styles.css\"},\"body\":{\"extsrc\":\"\"}}'/>51°01′12″N 114°01′57″W / 51.019890°N 114.032604°W / 51.019890; -114.032604 (Highfield station)"}">
Owned byCalgary Transit
PlatformsIsland platform
Tracks2
Construction
Structure typeAt grade
ParkingNone
AccessibleYes
Other information
Fare zoneFare paid
History
Opening2027 (2027)
ElectrifiedOverhead catenary
Services
Preceding station CTrain Following station
26 Avenue SE
toward Eau Claire
Green Line
(phase 1)
Lynnwood/Millican
toward Shepard
Close

The station will be at-grade, parallel to the existing freight railway tracks, and will have a bus loop. The station is expected to stimulate growth of the industrial park, because of increased transit connections for workers. The area has been identified by the City of Calgary to potentially become a generator for new commercial and high tech incubator development.[2]

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.