Closed as not planned
Description
The goal of this task is to use findings from #178 and #181 and plan and estimate the work that needs to be done to integrate Packit into console.redhat.com ( #175). Specifically:
- Go through the output of Research architecture of console.redhat.com #178 and Research RPM builder for console.redhat.com integration #181
- Create separate tasks for the work needed.
- Try to estimate the time/work needed for the work.
- Plan just the work needed to be done for MVP (to be defined in Define MVP for Packit console.redhat.com integration #180).
- Link the issues from the MVP epic issue (to be created in Define MVP for Packit console.redhat.com integration #180 ).
- Show the issues to the team.
This issue is part of the #175 epic.
Metadata
Metadata
Assignees
Labels
Type
Projects
Status
done