You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Current manual approval action is in the prod stage right before the prod deployment, but we shall move it to post gamma deployment (still within the gamma stage)
A manual approval step is added to the end of the Gamma stage.
Uh oh!
There was an error while loading. Please reload this page.
Current manual approval action is in the
prod
stage right before the prod deployment, but we shall move it to post gamma deployment (still within the gamma stage)Ref: https://aws-samples.github.io/aws-deployment-pipeline-reference-architecture/application-pipeline/ri-cdk-pipeline/#prod
The text was updated successfully, but these errors were encountered: