10000 [Snyk] Upgrade fullcalendar from 6.1.11 to 6.1.14 by DawoudIO · Pull Request #7072 · ChurchCRM/CRM · GitHub
[go: up one dir, main page]
More Web Proxy on the site http://driver.im/
Skip to content

[Snyk] Upgrade fullcalendar from 6.1.11 to 6.1.14 #7072

New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Merged
merged 1 commit into from
Jun 15, 2024

Conversation

DawoudIO
Copy link
Contributor

This PR was automatically created by Snyk using the credentials of a real user.


![snyk-top-banner](https://github.com/andygongea/OWASP-Benchmark/assets/818805/c518c423-16fe-447e-b67f-ad5a49b5d123)

Snyk has created this PR to upgrade fullcalendar from 6.1.11 to 6.1.13.

ℹ️ Keep your dependencies up-to-date. This makes it easier to fix existing vulnerabilities and to more quickly identify and fix newly disclosed vulnerabilities when they affect your project.


  • The recommended version is 2 versions ahead of your current version.

  • The recommended version was released on 21 days ago.

Release notes
Package name: fullcalendar
  • 6.1.13 - 2024-05-22

    TimeGrid

    • follow-up fix to #7533 that improves event-dragging from timed to all-day

    Timeline

    • follow-up fix to #7335 that sidesteps issues with dynamically loaded fonts
  • 6.1.12 - 2024-05-21

    General

    • fix: don't allow event drag-n-drop on obscured calendars (#5026)

    TimeGrid

    • fix: when moving event from all-day -> timed, use literal mouse position for event drop (#7533)

    Timeline

    • fix: timeline rtl initial scroll on Chrome (#7335)
  • 6.1.11 - 2024-02-20

    General

    • fix: fc-event-past className not attached to events that end midnight before today (#6120, #6486)
    • fix: aria-labelledby on view container should not exist when headerToolbar:false (#6884)

    DayGrid and MultiMonth

    • fix: possible infinite recursion with dayGrid, dayMaxEventRows, and many hidden event rows (#7462)
    • fix: possible +more link numbers incorrect (#7573, #6608, #6900)

    React

    Angular

    • fix: Angular 17 SRR error with el.getRootNode (#7550)
from fullcalendar GitHub release notes

Important

  • Check the changes in this PR to ensure they won't cause issues with your project.
  • This PR was automatically created by Snyk using the credentials of a real user.

Note: You are seeing this because you or someone else with access to this repository has authorized Snyk to open upgrade PRs.

For more information:

@DawoudIO DawoudIO requested a review from a team as a code owner June 13, 2024 01:15
@DawoudIO DawoudIO requested review from respencer, grayeul, DAcodedBEAT and MrClever and removed request for a team June 13, 2024 01:15
@DAcodedBEAT DAcodedBEAT added this to the 5.9.0 milestone Jun 13, 2024
@respencer respencer changed the title [Snyk] Upgrade fullcalendar from 6.1.11 to 6.1.13 [Snyk] Upgrade fullcalendar from 6.1.11 to 6.1.14 Jun 14, 2024
@DAcodedBEAT DAcodedBEAT force-pushed the snyk-upgrade-353816b9863bf56d92fbdcd92774e0b5 branch from a6ca56c to 073c5fc Compare June 15, 2024 08:05
@DAcodedBEAT DAcodedBEAT merged commit 45226f1 into master Jun 15, 2024
6 checks passed
@DAcodedBEAT DAcodedBEAT deleted the snyk-upgrade-353816b9863bf56d92fbdcd92774e0b5 branch June 15, 2024 15:53
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Projects
None yet
Development

Successfully merging this pull request may close these issues.

3 participants
0