Merge pull request #104 from getevo/detached #240
Annotations
3 errors
build (1.20.x)
Process completed with exit code 1.
|
build (1.19.x)
Process completed with exit code 1.
|
build (1.19.x)
The strategy configuration was canceled because "build._1_20_x" failed
|