Tags: jalexb88/NASSP
Tags
Apollo 7 checklist and scenarios (complete)
Apollo 7 documentation and scenario updates (done until 239h GET)
Merge pull request orbiternassp#40 from rcflyinghokie/master Checklist modifications based on actual TLI Checklist.
Apollo 7 documentation update (done until 164h GET)
CM RCS injector temperatures hardcoded to 30°F for System Test Meter
Merge pull request orbiternassp#39 from rcflyinghokie/master Apollo 8 Checklist Boost through TLI
Update WMIDPOS and WMIDVEL for Apollo 7-9 scenarios; documentation fi… …xes for Apollo 7
Complete set of Apollo Earth Landmarks (marker file + corrected AGC c… …oordinates)
Implementation of Virtual AGC standby mode (unfinished!)
PAMFD: Remove REFSMMAT uplink, fixes CTDs (issue orbiternassp#37)
PreviousNext