[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN200957263Y - An improved trampoline structure - Google Patents

An improved trampoline structure Download PDF

Info

Publication number
CN200957263Y
CN200957263Y CNU2006200595107U CN200620059510U CN200957263Y CN 200957263 Y CN200957263 Y CN 200957263Y CN U2006200595107 U CNU2006200595107 U CN U2006200595107U CN 200620059510 U CN200620059510 U CN 200620059510U CN 200957263 Y CN200957263 Y CN 200957263Y
Authority
CN
China
Prior art keywords
guardrail
trampoline structure
spring mattress
foot rest
catch net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2006200595107U
Other languages
Chinese (zh)
Inventor
林增祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YONGJI TRAVEL PRODUCTS ZHONGSH
Original Assignee
YONGJI TRAVEL PRODUCTS ZHONGSH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YONGJI TRAVEL PRODUCTS ZHONGSH filed Critical YONGJI TRAVEL PRODUCTS ZHONGSH
Priority to CNU2006200595107U priority Critical patent/CN200957263Y/en
Application granted granted Critical
Publication of CN200957263Y publication Critical patent/CN200957263Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B71/00Games or sports accessories not covered in groups A63B1/00 - A63B69/00
    • A63B71/02Games or sports accessories not covered in groups A63B1/00 - A63B69/00 for large-room or outdoor sporting games
    • A63B71/022Backstops, cages, enclosures or the like, e.g. for spectator protection, for arresting balls

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model relates to a children's amusement facility technical field, it discloses a modified trampoline structure. The utility model discloses a spring mattress, protecting wire, foot rest and guardrail, wherein, the foot rest is located the spring mattress lower extreme, and protecting wire and guardrail then set up in the spring mattress upper end, the guardrail locate the peripheral bracing piece of spring mattress and be located the last support ring at protecting wire top by many rings and constitute, the bracing piece cup joints each other by upper and lower two sections straight tubes and forms, wherein, the top of upper segment straight tube is equipped with the connecting cap, set up on the top face of connecting cap with last support ring complex draw-in groove. The utility model discloses an its bracing piece of guardrail is cup jointed structure, and adopts the draw-in groove to link to each other between bracing piece and the last supporting ring, and not only the structure is firm, and the bracing during dismouting is taken and is hung the operation and become very convenient moreover.

Description

一种改进的跳床结构An improved trampoline structure

技术领域:Technical field:

本实用新型涉及儿童娱乐设施技术领域,尤其是涉及一种可供儿童在上面蹦跳玩耍的跳床。The utility model relates to the technical field of children's entertainment facilities, in particular to a trampoline on which children can jump and play.

背景技术:Background technique:

当前,随着经济的发展和人民生活水平的提高,各种娱乐设施也逐步普及,跳床即为其中一种。常见的跳床主要由弹簧床垫、保护网、脚架以及护栏构成,其中脚架设置于弹簧床垫的下端,用于支撑弹簧床垫;保护网和护栏则设置于弹簧床垫的上端,用于防止儿童摔出跳床外。从目前市场上见到的跳床来看,其结构较为复杂,其护栏和跳床的其他部分之间拆装不方便,如一起包装和运输的话,体积和重量皆太大而给使用者搬运和安装带来很大的困难。At present, with the development of the economy and the improvement of people's living standards, various entertainment facilities are gradually popularized, and bed jumping is one of them. A common trampoline is mainly composed of a spring mattress, a protective net, a tripod and a guardrail, wherein the tripod is arranged at the lower end of the spring mattress to support the spring mattress; the protective net and the guardrail are arranged at the upper end of the spring mattress, Used to prevent children from falling out of the jump bed. Judging from the current trampoline seen in the market, its structure is relatively complicated, and it is inconvenient to disassemble and assemble between its guardrail and other parts of the trampoline. If it is packaged and transported together, the volume and weight are too large for the user to carry. And installation brings great difficulty.

实用新型内容:Utility model content:

本实用新型的目的在于针对现有技术存在的不足之处而提供一种改进的跳床结构,其护栏的拆装非常方便,且结构稳固。The purpose of the utility model is to provide an improved trampoline structure aiming at the deficiencies of the prior art, the guardrail of which is very convenient to disassemble and has a stable structure.

为实现上述目的,本实用新型包括弹簧床垫、保护网、脚架以及护栏,其中,脚架位于弹簧床垫下端,保护网和护栏则设置于弹簧床垫上端,所述的护栏由多根环设于弹簧床垫周缘的支撑杆以及位于保护网顶部的上支撑环构成,支撑杆由上、下两节直管相互套接组成,其中,上节直管的顶部设有连接帽,连接帽的顶端面上开设有与上支撑环配合的卡槽。In order to achieve the above object, the utility model comprises a spring mattress, a protective net, a tripod and a guardrail, wherein the tripod is located at the lower end of the spring mattress, and the protective net and the guardrail are arranged at the upper end of the spring mattress, and the described guardrail consists of a plurality of It consists of a support rod set on the periphery of the spring mattress and an upper support ring on the top of the protective net. The support rod is composed of upper and lower straight pipes connected to each other. The top of the upper straight pipe is provided with a connecting cap. The top end surface of the cap is provided with a card slot matched with the upper support ring.

所述的保护网用具有良好弹性的松紧带固定在护栏的中间部位。The protection net is fixed on the middle part of the guardrail with elastic bands with good elasticity.

各脚架与环状铁管通过T形三通管相连,在其中一些T形三通管的顶部,开设有供支撑杆的下节直管插套的圆形开口。Each tripod is connected to the ring-shaped iron pipe through a T-shaped three-way pipe, and at the top of some of the T-shaped three-way pipes, there are circular openings for inserting sleeves of the lower straight pipes of the support rods.

弹簧床垫的外套上对应支撑杆的下节直管位置处,开设有穿孔。The outer cover of the spring mattress is provided with perforations at the position of the lower straight pipe of the corresponding support rod.

弹簧床垫的中心网外缘环设有多个三角环,三角环上钩设有与脚架上端的环状铁管相连的弹簧,弹簧以正反向的方式交错排列。The outer edge ring of the center net of the spring mattress is provided with a plurality of triangular rings, and the upper hook of the triangular ring is provided with springs connected with the ring-shaped iron pipe at the upper end of the tripod, and the springs are staggered in forward and reverse ways.

保护网底部与中心网外缘的三角环之间通过绑绳串连在一起,所述绑绳的绳体为PP材料,绳体的前端为由PE材料制成的尖形头。The bottom of the protection net and the triangular ring on the outer edge of the central net are connected in series by a binding rope. The rope body of the binding rope is made of PP material, and the front end of the rope body is a pointed head made of PE material.

所述的保护网底部的织线为竖排式,其间具有多个小孔。The weaving lines at the bottom of the protection net are arranged vertically, with a plurality of small holes therebetween.

本实用新型的有益效果在于:其护栏的支撑杆为套接式结构,且支撑杆与上支撑环之间采用卡槽相连,不仅结构稳固,而且拆装时的撑搭与吊接作业变得非常方便。The beneficial effect of the utility model is that: the support rod of the guardrail is a socket structure, and the support rod and the upper support ring are connected by a card slot, not only the structure is stable, but also the brace and hoisting operations during disassembly and assembly become easier. Very convenient.

附图说明:Description of drawings:

下面结合附图对本实用新型做进一步的说明:Below in conjunction with accompanying drawing, the utility model is further described:

图1为本实用新型的整体结构示意图Fig. 1 is the overall structural representation of the utility model

图2为支撑杆的结构示意图Figure 2 is a schematic diagram of the structure of the support rod

图3为去掉保护网、护栏以及弹簧床垫外套后的跳床结构示意图Figure 3 is a schematic diagram of the trampoline structure after removing the protective net, guardrail and spring mattress coat

图4为去掉保护网、上支撑环后的跳床结构示意图Figure 4 is a schematic diagram of the trampoline structure after removing the protective net and the upper support ring

图5为支撑杆与T形三通管的连接示意图Figure 5 is a schematic diagram of the connection between the support rod and the T-shaped tee pipe

图6为弹簧床垫的中心网和环状铁管的连接示意图Figure 6 is a schematic diagram of the connection between the center net and the ring-shaped iron pipe of the spring mattress

图7为连接中心网和环状铁管的正反向弹簧示意图Figure 7 is a schematic diagram of forward and reverse springs connecting the central network and the ring-shaped iron pipe

图8为保护网和弹簧床垫的中心网的连接示意图Figure 8 is a schematic diagram of the connection of the protective net and the central net of the spring mattress

图9为保护网下端的结构示意图Figure 9 is a schematic diagram of the structure of the lower end of the protection net

具体实施方式:Detailed ways:

以下所述仅为本实用新型的较佳实施例,并不因此而限定本实用新型的保护范围。The following descriptions are only preferred embodiments of the present utility model, and do not therefore limit the protection scope of the present utility model.

见附图1所示:它包括弹簧床垫10、保护网20、脚架30以及护栏40,其中,脚架30位于弹簧床垫10下端,保护网20和护栏40则设置于弹簧床垫10上端,护栏40由多根环设于弹簧床垫10周缘的支撑杆41以及位于保护网20顶部的上支撑环42构成。见附图2所示:支撑杆41由上、下两节直管411和412相互套接组成,其中,上节直管411的顶部设有连接帽413,连接帽413的顶端面上开设有与上支撑环42配合的卡槽414。通过这种方式,护栏41的拆装将变得非常方便,而且结构上也很稳固。另外,保护网20可用具有良好弹性的松紧带(图中未表示出)固定在护栏40的中间部位,这样不但增加了保护网的牢固程度,同时也能缓冲撞击力,增强安全系数。See shown in accompanying drawing 1: it comprises spring mattress 10, protective net 20, tripod 30 and guardrail 40, wherein, tripod 30 is positioned at spring mattress 10 lower ends, and protective net 20 and guardrail 40 are arranged on spring mattress 10 At the upper end, the guardrail 40 is composed of a plurality of support rods 41 ringed around the periphery of the spring mattress 10 and an upper support ring 42 located at the top of the protection net 20 . As shown in accompanying drawing 2: the support rod 41 is made up of upper and lower straight pipes 411 and 412 which are socketed with each other, wherein the top of the upper straight pipe 411 is provided with a connecting cap 413, and the top surface of the connecting cap 413 is provided with a The card slot 414 matched with the upper support ring 42 . In this way, the disassembly and assembly of the guardrail 41 will become very convenient, and the structure is also very stable. In addition, the protective net 20 can be fixed on the middle part of the guardrail 40 with an elastic band (not shown) with good elasticity, which not only increases the firmness of the protective net, but also buffers the impact force and enhances the safety factor.

见附图3至附图5所示:各脚架30与环状铁管32通过T形三通管50相连,在其中一些T形三通管50的顶部,开设有供支撑杆41的下节直管412插套的圆形开口51。它与传统的焊接式结构相比,使用者可以支撑杆的下节直管直接插入T形三通管50内,操作非常方便,既节省了使用者的安装时间,又安全牢固。See accompanying drawing 3 to shown in accompanying drawing 5: each tripod 30 links to each other with annular iron pipe 32 by T-shaped three-way pipe 50, at the top of wherein some T-shaped three-way pipes 50, is provided with the lower support bar 41. Section straight pipe 412 inserts the circular opening 51 of sleeve. Compared with the traditional welded structure, the user can directly insert the lower straight pipe of the support rod into the T-shaped tee pipe 50. The operation is very convenient, which not only saves the installation time of the user, but also is safe and firm.

见附图1所示:弹簧床垫10的外套13上对应支撑杆41的下节直管412位置处,开设有穿孔131。它与传统的封闭式外套相比,这种结构可以方便支撑杆与T形三通管50的搭接,非常方便、快捷和美观。See shown in accompanying drawing 1: on the outer cover 13 of spring mattress 10, the position of the lower section straight pipe 412 corresponding to the support rod 41 is provided with a perforation 131. Compared with the traditional closed jacket, this structure can facilitate the overlapping of the support bar and the T-shaped tee pipe 50, which is very convenient, fast and beautiful.

见附图6和附图7所示:弹簧床垫10的中心网11外缘环设有多个三角环111,三角环111上钩设有与脚架30上端的环状铁管32相连的弹簧12,弹簧12后端与中心网11外侧的拉环111相的挂钩方向一致,但弹簧12前端与环状铁管32相连的挂钩按一上一下的方式(即正反向方式)交错排列,这种结构可使中心网11具有结构牢固、受力均匀、减缓振动以及经久耐用的优点。See accompanying drawing 6 and shown in accompanying drawing 7: the central net 11 outer edge ring of spring mattress 10 is provided with a plurality of triangular rings 111, and the upper hook of triangular ring 111 is provided with the spring that links to each other with the annular iron pipe 32 of tripod 30 upper ends 12. The rear end of the spring 12 is in the same direction as the hook of the pull ring 111 on the outside of the center net 11, but the hooks connected to the front end of the spring 12 and the ring-shaped iron pipe 32 are arranged in a staggered manner (i.e., forward and reverse). This structure can make the central net 11 have the advantages of firm structure, uniform force, vibration reduction and durability.

另外,在中心网、保护网中间以及四个护栏旁皆可设置松紧绳,因松紧绳的弹力,可缓解小孩在弹跳时的冲击力。In addition, elastic ropes can be installed in the middle of the central net, the protection net and beside the four guardrails. Due to the elastic force of the elastic rope, the impact force of the child when jumping can be alleviated.

见附图8所示:保护网20底部与中心网11外缘的三角环111之间通过绑绳串连在一起,所述绑绳的绳体61为柔软的PP材料,绳体61的前端为由质地较硬的PE材料制成的尖形头62。在尖形头62的引导下,绑绳交错穿过三角环111和保护网20底部,使保护网20和弹簧床垫10之间的连接非常方便,而且也非常牢固。As shown in accompanying drawing 8: the bottom of the protective net 20 and the triangular ring 111 on the outer edge of the center net 11 are connected in series by a binding rope. The rope body 61 of the binding rope is made of soft PP material, and the front end of the rope body 61 It is a pointed head 62 made of hard PE material. Under the guidance of the pointed head 62, the binding ropes are interlaced through the triangular ring 111 and the bottom of the protective net 20, so that the connection between the protective net 20 and the spring mattress 10 is very convenient and very firm.

见附图9所示:保护网20底部的织线21为竖排式,其间具有多个小孔22,以供绑绳穿设。See shown in accompanying drawing 9: the weaving thread 21 at the bottom of the protective net 20 is a vertical row type, and there are a plurality of small holes 22 therebetween for the threading of the binding rope.

Claims (7)

1. improved trampoline structure; it comprises sping mattress (10); catch net (20); foot rest (30) and guardrail (40); wherein; foot rest (30) is positioned at sping mattress (10) lower end; catch net (20) and guardrail (40) then are arranged at sping mattress (10) upper end; it is characterized in that: upper support ring (42) formation that described guardrail (40) is located on the support bar (41) of sping mattress (10) periphery by many and is positioned at catch net (20) top; support bar (41) is by last; the mutual socket of two joint straight tubes (411) and (412) is formed down; wherein; the top of last joint straight tube (411) is provided with attachment cap (413), offers the draw-in groove (414) that cooperates with upper support ring (42) on the top end face of attachment cap (413).
2. trampoline structure according to claim 1 is characterized in that: described catch net (20) is fixed on the middle part of guardrail (40) with the elastic cord with favorable elasticity.
3. trampoline structure according to claim 2, it is characterized in that: each foot rest (30) links to each other by T tube (50) with ring-type iron pipe (32), the top of some T tubes (50) offers the circular open (51) for following joint straight tube (412) sleeve of support bar (41) therein.
4. trampoline structure according to claim 3 is characterized in that: the overcoat (13) of sping mattress (10) is gone up following joint straight tube (412) position of corresponding support bar (41), offers perforation (131).
5. trampoline structure according to claim 1, it is characterized in that: central network (11) outer rim of sping mattress (10) is equipped with a plurality of three square rings (111), three square rings (111) are risen to the bait and are provided with the spring (12) that links to each other with the ring-type iron pipe (32) of foot rest (30) upper end, and spring (12) is staggered in forward and reverse mode.
6. trampoline structure according to claim 5; it is characterized in that: be chained together by tying up rope between three square rings (111) of catch net (20) bottom and central network (11) outer rim; the described rope body (61) of tying up rope is the PP material, the oxycephaly (62) of the front end of rope body (61) for being made by the PE material.
7. according to each described trampoline structure in the claim 1 to 6, it is characterized in that: the line (21) of knitting of described catch net (20) bottom is a vertical row type, has a plurality of apertures (22) therebetween.
CNU2006200595107U 2006-05-25 2006-05-25 An improved trampoline structure Expired - Fee Related CN200957263Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2006200595107U CN200957263Y (en) 2006-05-25 2006-05-25 An improved trampoline structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2006200595107U CN200957263Y (en) 2006-05-25 2006-05-25 An improved trampoline structure

Publications (1)

Publication Number Publication Date
CN200957263Y true CN200957263Y (en) 2007-10-10

Family

ID=38784138

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2006200595107U Expired - Fee Related CN200957263Y (en) 2006-05-25 2006-05-25 An improved trampoline structure

Country Status (1)

Country Link
CN (1) CN200957263Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2473249A (en) * 2009-09-04 2011-03-09 Crowntec Fitness Mfg Ltd Bracing structure for trampoline net
CN102614622A (en) * 2012-04-17 2012-08-01 苏州海天运动器材有限公司 Trampoline
US10780334B2 (en) 2018-06-30 2020-09-22 Avero Ab Zippered safety layer in a trampoline
EP3685889A3 (en) * 2019-01-26 2020-10-14 Avero AB High-tension safety net in a trampoline

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2473249A (en) * 2009-09-04 2011-03-09 Crowntec Fitness Mfg Ltd Bracing structure for trampoline net
GB2473249B (en) * 2009-09-04 2011-07-20 Crowntec Fitness Mfg Ltd Trampoline surrounding net bracing structure
CN102614622A (en) * 2012-04-17 2012-08-01 苏州海天运动器材有限公司 Trampoline
US10780334B2 (en) 2018-06-30 2020-09-22 Avero Ab Zippered safety layer in a trampoline
EP3685889A3 (en) * 2019-01-26 2020-10-14 Avero AB High-tension safety net in a trampoline
US11202952B2 (en) 2019-01-26 2021-12-21 Avero Ab Corner support bar (CSB) in a trampoline
US11273356B2 (en) 2019-01-26 2022-03-15 Avero Ab High-tension safety net in a trampoline
US11577144B2 (en) 2019-01-26 2023-02-14 Avero Ab Silent performance system and under padding channels in a trampoline

Similar Documents

Publication Publication Date Title
CN202777569U (en) Bouncing bed
CN201105113Y (en) Trampoline fence structure
CN200957263Y (en) An improved trampoline structure
CN205948263U (en) Trampoline with shooting device
CN206660402U (en) Grafting assembly type trampoline
CN108477044A (en) Large-scale floating cultivates platform cage structure
CN205516154U (en) Connecting piece of trampoline guardrail net
CN201664487U (en) Safety protection little trampoline
CN2889369Y (en) Improved structure of trampoline
CN204317167U (en) A kind of tree protector that can be used as Relaxing chair
CN208244061U (en) A kind of Body-building sandbag suspended and fixed device
CN206621803U (en) A kind of track and field hurdles rack
CN215427122U (en) Children's protecting net trampoline
WO2019100983A1 (en) Lift net support
CN210384818U (en) A parent-child fitness and entertainment device
CN203899081U (en) Portable badminton net rack
CN2860536Y (en) Jumping bed structure improvement
CN2571421Y (en) Trampoline Safety Fence Bar Engagement Construction
CN208875156U (en) It is a kind of to put wire stitcher without what hand was thrown for what hand throwing net or rotation were netted
JP3054792U (en) Play net
CN205549415U (en) Extend training equipment
CN220302493U (en) Connecting piece on trampoline
CN2892167Y (en) Structural improvement of trampoline
CN216725709U (en) Tennis training device
CN201333273Y (en) Improved trampoline

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071010

Termination date: 20140525